2010 News Releases Archive
Hathor Extends Roughrider East 60 m to the East as Summer Drill Program Progresses
TERRA VENTURES INC.: Hathor Commences Three Rig Drill Program at its Roughrider Uranium Deposit
Hathor Receives Final Winter Assays and Plans an Aggressive Summer Drill Program to Test the Full Potential of Roughrider East
High Grade Uranium Intersections at Roughrider Bolstered by Recoveries of up to 98.9% in Metallurgical Leach Tests
Hathor Intersects 7.5 m at 43.64 % U3O8 and 23 m at 24.31 % U3O8 in Two Separate Holes: the Best Results to Date at Roughrider
New Mineralization Discovered in Area 3 at Roughrider, With Assays up to 26.5 m of 3.55% U3O8 , including 6.0 m of 14.46 % U3O8
New Zones Discovered at Roughrider Return Assays as High as 22.50 m of 11.31 % U3O8
Terra Ventures Inc.: Hathor Plans Detailed Follow-up Drilling as Roughrider East Gives 100 m of Strike Extent to Uranium Mineralization
TERRA VENTURES INC.: Roughrider Continues to Grow
Roughrider Continues to Grow with Massive Uranium Mineralization and Off-Scale Radioactivity
Numerous New Zones of Off-Scale Radioactivity and Visible Uranium Mineralization Intersected At Roughrider Uranium Deposit
Hathor Intersects 81.5 m of 1.59 % U3O8 at Roughrider Zone East, including a 13.5 m interval of 6.52 % U3O8 with assays as high as 68.1 % U3O8
Hathor Intersects Off-Scale Radioactivity in Seven Holes at Roughrider Zone East
Hathor Commences Drilling At Midwest Northeast Property
|
|